A blueprint for the United Kingdom’s next era of growth

Source: McKinsey & Company•November 29, 2026 at 07:33 PM

A blueprint for the United Kingdom’s next era of growth

After years of economic stagnation, the United Kingdom has an opportunity to renew its economic dynamism through investment.

Across advanced economies, a crisis of hope is emerging. In the United Kingdom, only 14 percent of people believe the next generation will be better off than the current one. Prosperity depends on innovation and investment, but a society that does not believe in its future is unlikely to imagine a better one, let alone invest in it.

For a country that was the cradle of modern economic growth, this risk is particularly striking. After centuries of essentially no improvement in living standards, the merchants, inventors, thinkers, and artisans of Britain changed the fate of humanity. The Industrial Revolution was the launchpad of modern economic growth and arguably the most important economic event in human history.

In the 19th century, as the Industrial Revolution spread from mills and factories in the heart of England to many other parts of the world, global incomes doubled. But over the past 100 years, incomes have grown sixfold, changing human fortunes to an astonishing degree. Since 1925, the average global life expectancy has increased to about 73 years from 30 to 40. Childhood deaths have fallen from one in three to fewer than one in 25. The literacy rate has increased to nearly 90 percent, up from about 30 percent. And the percentage of humans living in extreme poverty has declined from 60 percent to less than 10 percent.

Prosperity depends on innovation and investment, but a society that does not believe in its future is unlikely to imagine a better one, let alone invest in it.

Prosperity depends on innovation and investment, but a society that does not believe in its future is unlikely to imagine a better one, let alone invest in it.

The United Kingdom jumped on the growth curve earlier than other nations because of its history of innovation and industrialisation. The UK's progress has persisted across all the measures cited above, with average incomes almost five times higher than a century ago, life expectancy of 81 years, and near-universal literacy (see Exhibit 1 for several progress metrics).

But progress is never a smooth ride, and the United Kingdom’s has stalled in the past couple of decades. As one of the 20 richest economies in the world, excluding very small countries and oil exporters, the United Kingdom had the eighth-fastest per capita GDP growth between 1995 and 2007, before the global financial crisis hit. Since then, its growth has slipped to the 17th position. One important factor in this decline is slowing productivity growth, which all countries experienced. In the United Kingdom, productivity growth fell from 2.0 percent per annum to 0.9 percent. Had the country’s income per person continued growing at the rate of the precrisis period, it would be around £16,000 higher today (Exhibit 2). In terms of productivity levels, the United Kingdom ranked 14th out of 20 in 2025.

Given this challenge, what could economic progress look like between now and 2100? In A Century of Plenty: A Story of Progress for Generations to Come, the McKinsey Global Institute argues that the world is capable of achieving far higher levels of prosperity over the course of this century than many assume possible today (see sidebar, “Global growth over the next century”). The book emphasises that the real limits of global economic progress are social and political, not physical. They lie in our choices, not in the planet’s inherent constraints.

What powered the past century of progress can also power the next one, but this requires restarting the engine of economic growth. Given the technological possibilities of today, returning to the United Kingdom’s pre-2008 productivity growth rate of around 2 percent annually ought to be considered the minimum ambition, not the ceiling. Faster productivity growth is technologically possible, but will the country mobilise the institutions, investment, and political will required to achieve it?

Why productivity?

Why does productivity-driven economic growth matter? First, productivity is the single most important factor behind the growth of wages, which were just 5 percent higher in 2025 than in 2007, on average. Today, around one in five people in the United Kingdom still live below the “empowerment line,” the threshold above which people have enough security and breathing room to shape their lives, invest in themselves, and build a buffer against shocks.

Second, economic growth comes from two sources: expanding the workforce and increasing the productivity of workers already in it. With an aging population and slower labour-force growth, productivity growth becomes even more important.

Third, the country faces a growing set of demands on public resources. An aging society will require higher spending on healthcare and pensions. A more volatile world has led to higher investment in defence. Building infrastructure, including for the energy transition and expansion that is required, will demand large-scale capital investment, while persistent regional and income inequalities continue to call for renewed social investment. Without sustained GDP growth, these spending priorities will become zero-sum trade-offs: Funding one means cutting another. A growing economic pie does not eliminate hard choices, but without it, every choice becomes more painful.

The overarching theme central to the United Kingdom’s transformation is the capacity to mobilise and deploy investment at scale. Businesses and policymakers need to invest in three areas: an abundant and reliable energy system, housing and modern infrastructure to support productive cities, and accelerated innovation and AI adoption, supported by deep pools of talent.

Invest

Investment is the central piece in this story. Capital deepening—growing investment in infrastructure, machinery, and intangible assets such as software and R&D—enables workers to produce more per hour and accelerates innovation diffusion. In the last quarter century, capital deepening accounted for 70 to 80 percent of productivity growth across regions. Globally, the amount of capital per worker is around nine times higher today than in the early 20th century. The United Kingdom started from a higher base than the average country, so the increase has been smaller, but capital per worker has still grown sevenfold since 1925.

In the past three decades, however, investment has stalled. Among the 20 richest economies in the world, the United Kingdom has consistently had the lowest gross fixed capital formation as a share of GDP (Exhibit 3). Slowing investment per worker accounts for around half of the productivity growth slowdown since the financial crisis.

In fact, the economy has experienced episodes of “capital shallowing,” when investment failed to keep pace with employment growth. Persistent underinvestment has therefore been a structural, not cyclical, constraint on growth.

Additionally, existing capital stocks are low compared with other advanced economies. In the United Kingdom, the value of installed capital—the buildings, machines, and intangibles that exist today—is about twice the value of its GDP, compared with three to four times for all other advanced economies. One reason is that much of the UK’s capital has depreciated and not been replaced. In 2019, UK workers had access to a third less capital per hour worked than those in peer countries, amounting to a capital gap of around £2 trillion.

Incentivising private investment is central to reversing this trend. Public investment matters, and it can complement private investment, but because most investment comes from the private sector, most growth is likely to originate there. There are many ways to boost private investment, but the main one is restoring the collective will to build. Policy inertia, regulatory bottlenecks, and a mindset of scarcity get in the way of building the future; changing that trajectory depends on policymakers, business leaders, and civil society.

Power

Access to abundant, affordable energy is essential, both for families to enjoy a good life and for businesses to remain competitive. High energy costs put businesses at a disadvantage, discourage investment, and ultimately hold back productivity growth.

Today, the world is in a race for electrons. Only 20 percent of energy comes from electricity, but in a plentiful world, we estimate it could go up to 70 or 80 percent by 2100. The ability to expand energy supply—particularly electricity generation and connection—is becoming increasingly critical to support the growth of data centres, electric vehicles, and a wide range of other technologies and uses upon which productivity growth depends.

The United Kingdom was the world’s first energy superpower, but that is no longer the case, and the shift shows up most clearly in what the country produces. Britain now generates far less electricity per person than other high-income economies and about one-third less than it produced at its peak in 2003. On average, the European Union supplies about 50 percent more electricity per capita than the United Kingdom, and China has surpassed both regions (Exhibit 4).

UK energy costs are high compared with European countries. Industrial electricity prices in 2024 were 27 pence per kilowatt-hour, compared to 13 pence in Spain, 16 pence in France, and 21 pence in Germany. This is because of many factors, including the country’s dependence on natural gas, some net-zero policies, and high grid and balancing costs.

To help regain its ability to expand energy capacity and reduce costs, the United Kingdom needs to scale and, crucially, connect cheap, reliable energy sources. Power generation, long-distance transmission, local distribution, storage, and connections to end users—such as factories, data centres, and chargers—could all be designed in a coordinated build-out.

Take nuclear as an example. In 1998, the United Kingdom supplied 99 terawatt-hours (TWh) of nuclear-powered electricity annually. From that peak, its supply has fallen by more than half to 36 TWh today. In our plentiful 2100, we imagine a world powered 40 percent by solar and wind, 40 percent by nuclear, and 20 percent by a combination of other sources. This is one of many potential scenarios, but it highlights the need to scale renewables, storage, and stable sources.

Alongside scaling power, the United Kingdom (and the world) requires a large, challenging physical transformation that includes critical minerals, grid expansion, and investment in charging points for electric vehicles. Networks, not generation alone, are emerging as the critical bottleneck. Without grid expansion, power generated in the north and at sea cannot reliably reach demand in the south, new offshore wind cannot connect at scale, and large factories and data centres cannot plug in when they are ready. Constraint costs—paying generators to increase or reduce electricity output to balance the grid—already totalled £1.9 billion between 2025 and 2026 and could approach £8.0 billion by 2030 without acceleration of grid upgrades. Ofgem estimates that the required grid investment could cost up to £70 billion through 2031.

The technology exists to scale, but complex planning processes, long approval timelines, and overlapping regulatory hurdles act as constraints on energy supply. Projects take years or even decades to move from proposal to construction, creating uncertainty, raising costs, and ultimately limiting the scale of deployment.

Nuclear projects often run into these hurdles. Readers may be familiar with the delays and cost overruns associated with the construction of Hinkley Point C, a nuclear power station in the United Kingdom. Another nuclear power station, Sizewell C in Suffolk, was billed as Hinkley’s smarter sibling, with an 85 percent shared design and shared suppliers. It also paid £1.6 billion to Hinkley for lessons learned. Yet approval has been delayed by at least 28 months. First power is not expected until the late 2030s, and baseline costs are around £38 billion.

Nuclear projects go through granular environmental and safety processes. One task force reviewing nuclear regulation has argued that the system has become as focused on “slavish compliance” as it is on outcomes. The National Audit Office concluded that no reactor of this design has been delivered on time and on budget. The lessons learned from Hinkley are clear but have not yet been applied successfully.

This is not unique to the United Kingdom: Across more than 150 large infrastructure projects globally, cost overruns average around 50 percent of the initial budget, according to McKinsey analysis, and schedules are typically delayed by about 25 months. Reversing these realities requires shifting from a system designed to restrict to one designed to enable, where clear standards are established up front and projects that meet them can proceed quickly and predictably.

Technologies, including nuclear, are not inherently expensive, but they have become so in the United Kingdom and in some other countries because of fragmented project pipelines, stop-start deployment, and costly regulatory processes. While countries such as South Korea build reactors at a fraction of the cost by standardising designs and constructing them in fleets, other countries approach each project as a one-off, driving up both time and expense. As a result, the levelised costs of nuclear energy are almost three times more expensive in some European countries than in South Korea. Restoring a “build at scale” capability through repetition, standardisation, streamlined approvals, and faster execution would not only lower costs but also help reestablish the abundance of energy that has historically underpinned Britain’s economic strength.

Of course, energy consumption comes with a well-known externality: CO2 emissions. The United Kingdom has made rapid progress toward decarbonisation, with around 20 percent of energy and nearly 70 percent of electricity generation now coming from low-carbon sources. In fact, annual CO2 emissions have fallen rapidly since their peak in the 1970s, and today they are at the same level as in 1880, when the United Kingdom had half its current population. Since 1990, the economy has grown by more than 90 percent, while total emissions (adjusted for “offshored emissions”) fell by almost 30 percent.

Decarbonisation is well underway and remains important, but the United Kingdom needs an energy transition and an energy expansion. The historical pace of building has been too slow to meet even modest growth in electricity demand, which will grow faster in the future. Delivering this will require balancing four interconnected priorities: sustainability, security, affordability, and competitiveness.

Build

Housing and infrastructure constraints have become structural drags on productivity. Start with housing. Affordable housing affects life choices and opportunities, including where people choose to live, when they can leave their parents’ house, and how many children they can have. It is also the main way that people build wealth: About two-thirds of global wealth is in the form of real estate.

Housing also affects productivity, thus straining wages and affecting living standards. Most innovation and investment happen in cities, where companies, universities, and other institutions are located. This concentration can lead to “agglomeration effects,” which refer to the new technologies, products, services, and industries that result from the seamless transfer of ideas. When housing supply is short and prices are high, those who are less well-off get left behind. Many people, including those who are young, ambitious, and innovative, often can’t afford to move to where the action is, dragging the country’s productivity down.

The United Kingdom has about 450 dwellings per 1,000 people. Comparatively, the European Union’s average is above 500, and countries such as France and Italy are close to 600. Parliament has set an ambition to deliver 1.5 million homes between 2024 and 2029, but current delivery remains well below that pace, with only roughly 220,000 homes delivered each year. In fact, building rates are falling. The government has a target of building 88,000 homes per year in London, but in 2025, fewer than 6,000 projects were started, almost 95 percent below target.

Housebuilding has fallen to a lower level in London than in any other major city, resulting in higher costs. In the late 1990s, the average citizen needed less than four years of earnings to buy a home. Today, according to forthcoming research by the McKinsey Global Institute, it is more than six years. By another metric, according to the Bank of England, the last time house prices were this high relative to average earnings was in the 1870s.

Building constraints extend beyond housing and into other types of infrastructure, including transport. The United Kingdom was once a transport powerhouse. It pioneered the modern railway age with the Stockton and Darlington Railway in 1825, invented the metro when London opened the world’s first underground railway in 1863, and introduced the first deep-level electric railway in 1890. The United Kingdom also built some of the institutional foundations of modern road transport through turnpike trusts, which were empowered by Parliament to levy tolls and use the proceeds to repair and improve roads. It was also at the forefront of canal infrastructure.

But building infrastructure has become much harder. For one, the country could face some first-mover disadvantages. It may be more difficult to modify old infrastructure than to build it from scratch with newer methods and technologies directly adapted to current needs, as many Chinese cities do. But even compared with many peers, Britain delivers infrastructure too slowly, too expensively, and too uncertainly.

Low investment can add to the challenge, but there are other issues, such as long and overlapping approval processes, legal challenges, fragmented responsibilities, bespoke designs, and stop-start pipelines that prevent learning by doing.

There is a sizeable and measurable gap between the United Kingdom’s infrastructure ambitions and delivery: A previous McKinsey analysis reveals that only about 59 percent of planned public infrastructure spending actually materialised between 2015 and 2024—a shortfall of roughly £160 billion—and that without sharper execution, a similar pattern could leave some £250 billion worth of this decade’s commitments unbuilt.

Heathrow’s third runway illustrates that gap. While the engineering capacity exists to complete the project, issues such as deciding, consenting, and sustaining the project have contributed to a decades-long delay. The project was envisaged in a 2003 aviation white paper and then backed by national policy in 2018. In 2020, the expansion was blocked in court on climate grounds and then restored by the Supreme Court the same year. Further delays have meant operations are now targeted for 2035, more than three decades after the white paper that first envisaged expansion was presented.

Transport is not just a convenience. Like housing, it is part of the production function of a modern economy. Good transport enlarges labour markets, connects firms to suppliers and customers, and increases the density of interactions through which ideas spread and productivity rises. The size of a city is measured in time, not in miles. Better rail, road, and urban transit effectively enlarges cities by shrinking travel times, allowing workers to access more productive jobs and firms to draw on larger pools of talent. For a trading nation, aviation and airport capacity are also an essential part of the same story.

A stable pipeline, data discipline, digital delivery, and stable programme leadership can help close the sizeable infrastructure gap. Those shifts are hard to sustain, but they can be the difference between seeing a pipeline on paper and putting the infrastructure in place, which will improve lives and livelihoods and enable long-term economic growth.

Cities fail to progress because of bad incentives, not bad intentions. To put in place the right incentives and delivery mechanisms, the United Kingdom would benefit from a planning and consenting regime that is faster, clearer, and more predictable, with fewer opportunities for delay once projects meet well-defined standards. It also needs to align stakeholders more effectively. Housing and infrastructure projects are enormously complex, involving initiatives and policies across financing, urban planning, infrastructure development, land-use regulation, building codes, contracting, and more. Yet people from each part of the system rarely work together. One option is to set up “delivery labs,” bringing together people across these specialties for fast-paced, intensive working events to translate plans into common execution. These groups could define concrete initiatives, assign ownership, align on budgets, and set measurable targets.

But the country also needs to get better at the act of building itself. Construction productivity in the United Kingdom has flatlined for decades, as is the case in most advanced economies. A failure to industrialise is the root of this problem. Too much construction still relies on bespoke designs and fragmented delivery, which makes it hard to standardise and improve at scale. Even when firms make progress on individual projects, the sector struggles to spread those gains across whole portfolios.

And while new technologies are attracting more attention, many have so far been used more to improve control and monitoring than to transform frontline productivity itself. The opportunity lies in partially shifting construction away from a craft model and toward a more industrial one: using greater standardisation, modularisation, and prefabrication; adopting more digital tools; and developing a stronger capability to scale successful practices across many projects.

A greater number of large companies with the resources to innovate, invest, and train their workers can drive higher productivity than a multitude of smaller, less productive businesses.

Scale

The United Kingdom has long been a country that invents. From the steam engine and the spinning jenny to the jet engine, the World Wide Web, and the discovery of the structure of DNA, the modern world is full of British ideas, and that tradition remains alive and well.

Cambridge-based Arm designs the chip architecture that powers nearly every smartphone on the planet. AstraZeneca, GSK, and a fast-growing life sciences cluster around Oxford and Cambridge keep the United Kingdom among the world’s top three pharmaceutical innovators. Rolls-Royce is one of the few firms in the world developing small modular nuclear reactors. Oxford Nanopore is reshaping genomic sequencing. Google DeepMind, founded in London, used AI to predict the 3D structures of more than 200 million proteins with AlphaFold (after famously defeating Korean Go champion Lee Sedol with AlphaGo). Revolut, Wise, and a generation of fintechs have rewritten how people move and manage money. The UK start-up ecosystem has produced more than 200 companies worth $1 billion or more, making it third globally in absolute numbers, only behind the United States and China.

In short, the innovation engine is real: The United Kingdom ranks fifth in the world on WIPO’s Global Innovation Index, behind only Switzerland, Sweden, the United States, and Singapore. Britain should continue to embrace it.

The country invests to keep its engine running. Total UK R&D reached £79.4 billion in 2024, and business R&D alone rose to £55.6 billion, or 70 percent of total R&D activity. That puts the United Kingdom’s R&D spend at around 2.7 percent of GDP, right at the OECD average, ahead of France (2.2 percent) but short of the global frontier set by Israel (6.3 percent), South Korea (5.0 percent), Sweden (3.6 percent), and the United States (3.5 percent).

← All articles

What this article says

More in IT Consulting & Services

All →
Keeping Shelves Stocked: How Striim Turns CDC into Stockout Prevention
Striim

Keeping Shelves Stocked: How Striim Turns CDC into Stockout Prevention

AI Validation in GxP: How to Keep Models Under Control
Artezio

AI Validation in GxP: How to Keep Models Under Control

ALCOA+ Data Integrity by Design for Pharma Software
Artezio

ALCOA+ Data Integrity by Design for Pharma Software

Press release N-iX Data Index 2027 Report Publication
N-iX

Press release N-iX Data Index 2027 Report Publication

Orchestrating resilience: Closing the execution gap in citizen supply chains
CGI

Orchestrating resilience: Closing the execution gap in citizen supply chains

Three (theoretically) safe scientific feuds to bring to the dinner table
Nordcloud

Three (theoretically) safe scientific feuds to bring to the dinner table